Industry
Manufacturing and industry
The cost of a stopped line is counted by the minute. The floor runs locally; management sits at the center.
What we do in this industry
EDGE INFRASTRUCTURE
Systems on the plant floor run locally; the line keeps moving even when the connection drops.
REDUNDANCY PLAN
Redundancy is designed per line, not per plant; critical lines are doubled and the rest run single.
OT–IT SEPARATION
The production network is never opened to the office network; all traffic between them passes through one audited point.
MAINTENANCE WINDOW
Updates follow the shift plan. We schedule around your production calendar.
Related services
The services that directly address this industry's requirements.
A question about this industry?
Tell us how things are set up today and we will work out where to start.